Boardsesh
Connect Boardsesh to bring your board climbing into Sequence. Every climb you tick in Boardsesh is added to your Boulder (Indoor) logbook, and each day you climbed becomes a completed Board Climbing session in your Planner. You set up the connection on the web.
Connecting Boardsesh
Open Integrations
In Sequence, go to Settings → Integrations and find the Boardsesh section.
Click Connect
Click Connect. Sequence takes you to Boardsesh.
Sign in and approve
Sign in to Boardsesh if you aren’t already, and approve access for Sequence. Sequence can read your logbook and profile; it can’t change anything in Boardsesh.
Wait for the first sync
You’re brought back to Settings → Integrations and see Boardsesh connected. Sequence starts importing your full Boardsesh history straight away.
Once connected, the section shows Connected to Boardsesh with your Boardsesh account name and the date you connected.
Only the account owner can connect or disconnect Boardsesh. A coach in Coach Mode can’t connect a client’s account, because whoever is signed in to Boardsesh in that browser would be linked.
If you see “Boardsesh can’t accept new connections right now”, Boardsesh has paused new connections for a while. Try again later.
How Syncing Works
When you log a climb in Boardsesh, Boardsesh tells Sequence, and the climb is imported within about 15 minutes. Sequence also checks once a day in case anything was missed.
To sync straight away, click Sync now in the Boardsesh section. Boardsesh allows one sync every 15 minutes, so the button is unavailable for a short time after each sync. Under the button you’ll see when the last sync ran and its result, for example “12 imported, 0 updated, 1 skipped”.
What Gets Imported
Each tick becomes an entry in your Boulder (Indoor) logbook. Sequence creates the logbook if you don’t have one.
- Name — the climb’s name with the board angle, such as “Swooped @ 40°”. The same climb at a different angle is a separate entry. Climbs without a name are called “Spray wall climb”.
- Grade — the grade you gave the climb, or the board’s community grade if you didn’t give one. Sequence matches it to your logbook’s grade scale first, then V grades, then Font.
- Style — a flash is imported as Flash, a send as Redpoint, and anything else as Attempt.
- Attempts — the number of attempts you logged. Flashes don’t carry a count.
- Notes — your Boardsesh comment.
- Location — the board layout from Boardsesh.
Climbs are grouped by the day you climbed them, in your Sequence time zone. All the climbs from one day go into one completed Board Climbing session, noted “Imported from Boardsesh”. Sequence creates the Board Climbing workout and category the first time it imports. If you’re coached in Sequence, your coach sees these sessions in your Planner like any other completed workout.
Filling a Planned Session
If you’ve scheduled an indoor workout for the day you climbed and haven’t completed it, Sequence adds your climbs to that session and marks it complete, instead of creating a new Board Climbing session. This works when the workout includes the Boulder (Indoor) logbook and isn’t archived or from a coach.
For example, set up a “Limit Board” workout with a Boulder (Indoor) logbook and a Slider for effort, and schedule it for Tuesdays and Thursdays. After Tuesday’s session you open Sequence, your board ticks are already in the logbook, and all that’s left is logging your effort.
Skipped Climbs
A climb is skipped when it has no grade, its grade doesn’t match one of Sequence’s boulder grades, or it hasn’t changed since the last sync. Climbs you’ve deleted in Sequence are skipped too. The number skipped appears in the sync result.
Editing and Deleting Climbs
If you edit a climb in Boardsesh, the next sync updates the entry in Sequence, and moves it if you changed the day. If you delete a climb in Boardsesh, it’s removed from Sequence too.
You can edit imported entries in Sequence, and an empty Boardsesh comment won’t overwrite notes you’ve added. If you delete an imported entry in Sequence, later syncs won’t import it again.
When the last climb is removed from a session that Sequence created, the session is removed too, unless you’ve added something of your own to it, such as notes, a rating or other widget entries.
If Boardsesh Needs You to Sign In Again
The Boardsesh section shows “Boardsesh needs you to sign in again before Sequence can sync.” This can happen after you change your Boardsesh password. Click Reconnect and sign in to Boardsesh. Syncing picks up where it left off.
If you connect a different Boardsesh account, climbs imported from the previous account are removed and the new account’s history is imported.
Disconnecting Boardsesh
Go to Settings → Integrations, click Disconnect in the Boardsesh section, and confirm.
Disconnecting removes your imported climbs from your logbook and Planner unless you tick Keep the climbs already imported in the confirmation. Boardsesh asks apps to delete its data when you disconnect, so this is the default.
If you remove Sequence from Connected apps in Boardsesh instead, Sequence stops syncing and deletes the imported climbs.
If Sequence can’t reach Boardsesh while disconnecting, you’ll see a message asking you to remove Sequence in Boardsesh under Connected apps to finish.
Related
- Logbook — Ascent styles, grade scales, and grade pyramids
- Workouts — Build a board workout for imports to fill in
- theCrag — Import your outdoor ascents
- Boardsesh Help — Logging climbs and using Boardsesh itself